
Add to Cart
Galvanized W Beam Expressway Metal Roll Forming Machine 22KW Hydraulic Decoiler
1.The system is easy to operate and use. PLC:Panasonic(Can customize as customer require)
2.The surface of the final product is very smooth and beautiful without any scratch on the surface.
3.Controlling by computer, PLC display, operation is easy, running is steady and reliable,endurable,maintenance-free.
Technical Parameter
Item | Specification |
Steel Sheet Thickness | 2-3mm (depend on requirement ) |
Material of blad | Cr12Mov, quenching treatment |
Capacity of Decoiler | 5 Ton hydraulic decoiler |
Forming Speed | 5-8m/min(not including punching time) |
Roller Groups | about 13 stations main roller |
Roller Material | GCr15, quenching treatment |
Roller Diameter | 180mm |
Principal Axis | 45# high grade steel with quenching treatment |
Main Motor Power | 22 Kw |
Hydraulic Power | 7.5KW |
Transmiss way | Gearbox |
Main Components
Equipment name | Name |
Decoiler | 1 set |
Feeding& guide device | 1 set |
Punching device | 1 set |
Main roll forming machine | 1 set |
Hydraulic station | 1 set |
Control box system | 1 set |
Cutting device | 1 set |
Run out tables | 1 set |
Applications
Highway Guard Rail
Working Flow
Decoiler ---- Feeding --- Levelling---Punching--- Roll Forming ---- Cutting ---- Run out tables
Machine Photo
Installation of the machine
The individual components of the machine are installed according to the layout and prepared for the commissioning.
The installation comprises of:
- Installation by Sussman service technicians.
- The following services are included:
- Installation of the machine components.
- Adjustment of the machine components.
- Connection of all motors to the control cabinet.
- Installation of the required safety devices.
Delivery extent does not comprise of:
- Media supply (electrics, compressed air, etc.)to the machine(control cabinet)
- Raw material process material and fuels
- Raw material for test blocks
- Transport and lifting devices
- Auxiliary staff.
The operators of the plant should be present during the installation in order to become familiar with the new machines.
Commercial Conditions
1. Port of Loading: FOB Shanghai
2. Delivery time: 75 days after technical clearance and down payment
3. Payment: 30% TT in advance, balance before delivery
4. Assembly and comissioning: Two engineers will visit buyer's workshop for install, commission and training, the salary of our engineer cost USD100 per day. The customer should ensure the pre-installation being carried out appropriately.
5. Warranty: 12 months warranty starting from the date of the successful installation and commissioning of the equipments.