Sussman Machinery(Wuxi) Co.,Ltd

Sussman Machinery (Wuxi) Co., Ltd.

Manufacturer from China
Verified Supplier
10 Years
Home / Products / Cable Tray Roll Forming Machine /

1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO

Contact Now
Sussman Machinery(Wuxi) Co.,Ltd
Visit Website
City:wuxi
Province/State:jiangsu
Country/Region:china
Contact Person:MissSpring Wu
Contact Now

1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO

Ask Latest Price
Brand Name :Sussman
Model Number :SM-CT
Certification :CE,SGS,ISO
Place of Origin :Jiangsu,China
MOQ :1 set
Price :negotiable
Payment Terms :L/C, T/T
Supply Ability :5 sets per month
Delivery Time :60 days after deposit
Packaging Details :Film and steel wire
Thickness :1.0-2.0mm Galvanized steel
Main Power :5.5kw
Rolling Speed :10-15m/min
Electric Source :380V, 50HZ,3 phase
Roller Stations :10 stations
Cutting :Hydraulic Cutting
Hydraulic Station :4KW
Control system :Industry computer
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO

Technical parameter

Items Specifications Remarks
Material of coil Material Thickness 1.0-2.0mm galvanized
Un Coiler 3 tons manual
Forming system Rolling Speed 10-15 m/min
Roller Stations 10 stations
Roller Material

Gcr15 Steel with quenching 60mm shaft

Maim Motor Power 5.5 kw
Hydraulic cutting Power 4 kw

Cutting

system

Material Of Cutting CR12 with quench treatment
Hardness HRC58-62
Tolerance +-1.5mm
Electrical control system Electric Source

380V, 50HZ,3 phase

Also can satisfy Customer’s require

Control System PLC (Panasonic) as list in the note
Weight About 3 tons

Technological process


Uncoiler—Feeding—Leveling—Punching&Cutting—Roll forming—Output table

Installation of the machine

The Individual components of the machine are installed according to the layout and prepared for the commissioning.

The installation comprises of

- Installation by Sussman service technicians.

- The following services are included.

-Installation of the machine components

-Adjustment of the machine components

- Connection of all motors to the control cabinet

-Installation of the required safety devices.

Commercial Conditions

1. Port of Loading: FOB Shanghai

2. Delivery time: 60 days after technical clearance and down payment

3. Payment: 30% TT in advance, balance before delivery

4. Assembly and comissioning: Two engineers will visit buyer's workshop for install, commission and training, the salary of our engineer cost USD100 per day. The customer should ensure the pre-installation being carried out appropriately.

5. Warranty: 12 months warranty starting from the date of the successful installation and commissioning of the equipments.

Related Products

1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO

1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO

Inquiry Cart 0