Add to Cart
Galvanized Metal Door Machine Twin Lath Roller Shutter Slat Roll Forming Machine
Main Specifications
Description | offered specification |
Material thickness | 0.7-1.2mm |
Raw material | Galvanized coils yield strength ≤G250MPa |
Forming speed | 8-15m/min |
Decoiler | 3 Ton passive decoiler |
Material of main shaft | 45# high quality steel |
Levelling device | 7 roller levelling including 3 top rollers and 4 bottom rollers |
Cutting | hydraulic cutting; quenching HRC58-62 |
Motor power of hydraulic station | 4kw |
Hydraulic station pressurre | 12Mpa |
Tolerance | 6m+-1.5mm |
Machine Frame | H Beam Steel |
Working flow
De-coiler—→level device—→main roll forming machine—→ hydraulic cutting—→ run out table
Machine component
3T Passive De-coiler
Diameter: 460-520mm expansion.
Expansion: Manually
Capacity: 3000kg
Leveling device
1.7 rolls leveling, 3 rolls up and 4 rolls down
2.Diameter is Ø 70mm, chrome and HRC60 heat treatment to secure the smooth surface
3.Max Leveling Raw Material width: 300mm
Hydraulic station
1. hydraulic station pressure: 12MP
2. power of hydraulic station: 4KW
Hydraulic Cutting
1. The cutter blade material: Cr12mov HRC58-62 degree
2. Blades number: 1 set
3. Cutting after forming: Cut the sheet after roll forming to required length
4. Cutting motion: The main machine automatically stops and the cutting will take place. After the cutting, the main machine will automatically start.
5. Material of blade: CR12with heat treatment
6. Length measuring: Automatic length measuring
7. Tolerance of length: 6m+/- 0.5mm
Control Box
(1)Power supply: 380 V, 50 Hz, 3Phase (adjusted with the requirement)
(2)Length & quantity measurement automatically;
(3)Length & quantity controlled by PLC
(4)Length inaccuracy can be amended easily.
(6).Control panel: Button-type switch and touch screen
(7)Unit of length: millimeter (switched on the control panel)
Output Table
Length : 2m
Quantity: 2 units
Standard Profile and Drawing
Loading pictures
Packaging Details: Main machine is nude in the container, the computer control box is packed with wooden packaging.
Delivery Detail: 60 workdays after we receive the 30% advance payment
Commissioning of the machine
The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.
The commissioning comprises:
- Commissioning by Suhang service technicians
- Training at the machine
- The following services are rendered
- Run up of the machine components
- Testing of all functions of the machine components
- Start of a fully automatic molding process
- Execution of machine acceptance
Delivery extent does not comprise of:
- Raw materials, process materials and consumables
- Raw material for test blocks
- Transport and lifting devices
The operators of the plant should be present during the commissioning in order to become familiar with the new machines.
Exhibition New:
You are warmly invitated to visit our booth at 2017 Thailand International Building Materials Exhibition at Bangkok May 2nd-7th, our booth No is N603-3