
Add to Cart
Automatic C Type Purlin Roll Forming Machine
Technical Parameter
| Items | Specifications |
| Material | Galvanized steel |
| Un Coiler | 3T passive uncoiler |
| Roll Forming Speed | 12--15 m/min |
| Roller Stations | 20 stations |
| Roller Material | Gcr15 coated with chrome |
| Maim Motor Power | 11kw |
| Motor cutting Power | 5.5kw |
| Material Of Cutting | CR12mov with quench treatment |
| Hardness | HRC58-62 |
| Tolerance | +-1.5mm |
| Cutting blades | 3 sets |
Electrical control system | Electric Source | 380V, 50HZ,3 phase |
| Control System | PLC (Panasonic) as list in the note |
| Weight | 12 tons |
| Way Of Drive | 1.5 inch double chain |
Machine List
3 ton passive de-coiler----------------------------------------------- 1 set
Feeding with guide---------------------------------------------------- 1 set
Main roll forming machine-------------------------------------------- 1 set
PLC Control box-------------------------------------------------------- 1 unit
Hydraulic station-------------------------------------------------------- 1 unit
Stop cutting device----------------------------------------------------- 1 unit
Safety cover------------------------------------------------------------- 1 unit
Out table------------------------------------------------------------------ 2 units
Advantage of Machine
1. Reasonable Price
2. High Quality
3. 12 Months Warranty
4. More Than 10 Years Experience
5. Durable
6. Reliable
During the warranty period, maintain and change the spare parts for the customers for free (except for the instrument damage caused by human factors or natural disasters. ) And provide technical support for life-long.
We can design and manufacture the machine according to clients' request! Our machines have passed CE, Guaranteed quality. Please send us the enquiry with Profile Drawing.
Working Flow of Roll Forming Machine
Profile of product
Photo Gallery
After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)