
Add to Cart
Galvanized Steel Curtain Fire Damper Frame Flange Roll Forming Machine Production Line Speed 6-10m/min
Technical Parameter
Items | Specifications | |
Material of coil | Material Thickness | 1.5-2mm |
Un Coiler | 3 tons manual | |
Forming system | Rolling Speed | 6-8m/min |
Roller Stations | About 16 stations | |
Roller Material | Gcr15 coated with chrome | |
Shaft diameter | 65mm | |
Maim Motor Power | 11kw | |
Pinching motor | 2.2kw | |
Motor cutting Power | 7.5kw | |
Cutting | Material Of Cutting | CR12mov with quench treatment |
Hardness | HRC58-62 | |
Tolerance | +-1.5mm | |
Cutting blades | 3 sets | |
Electrical control system | Electric Source | 380V, 50HZ,3 phase |
Control System | PLC (Panasonic) as list in the note | |
| Weight | About 6 tons |
| Way Of Drive | 1.2 inch chain |
Main Components
Machine list |
5 ton passive de-coiler | 1 set |
Leveller | 1 set | |
Punching | 4 sets | |
Main roll forming machine | 1 set | |
PLC Control box | 1 unit | |
Hydraulic station | 1 unit | |
Out table | 2 units |
Working Flow of Roll Forming Machine
A.Passive Decoiler..........................................................To load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the heavy material.)
B.Servo Feeding Applicator............................................To feed the material accurately
C.Hydraulic/Press Punching...........................................To punch as requirements
D.Roll Forming Unit.........................................................To roll form as requirements
E.Hydraulic Cutting.........................................................To cut sheets as desired length
(We also have non-stop hydraulic cutting system.)
F.Output Table................................................................Support the finished products
De-coiler—→Level device —→Main roll forming machine—→Hydraulic cutting—→ Run out table
Profile of product
Photo Gallery
Loading pictures
After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Company Profile
Sussman Machinery (wuxi) Co., Ltd. is specialized in building materials of light steel structure. Since the factory founded 10 years before, it always designs and produces various type profile
of roll forming machine.
The main products of factory is Roller shutter door, PU sandwish panel line, pre-painted steel forming machine, Racking roll forming machine, the cable tray roll forming machine, Glazed Tile forming machine, Automatical C/Z Purlin forming machine, Floor Deck forming machine, Guardrail forming machine, Down
Pipe forming machine, the whole carriage plate for car beam unit, Steel storage unit, etc. The products
are widely used in warehouse, factory buildings, supermarket, Nursing homes, villas and other
construction projects, Our factory can meet the construction enterprises, automobile industry, Iron and
steel production enterprises' growing demands.
Sussman machinery is located in Wuxi city, Jiangsu province which is close to Shanghai, It's about half an hour's journey. We enojoy the convenient transportation and advantageous location which supply good business opportunities for the buyers home and abroad.