
Add to Cart
Two In One Light Keel Roll Forming Machine , Metal Forming Equipment 0.2mm - 1.2mm Galvanized steel
Technical Parameter
| Items | Specifications |
Material of coil | Material Thickness | 0.2-1.2mm galvanized |
De-coiler | Weight | 3 ton manual |
Forming system | Rolling Speed | 10-12 m/min |
| Roller Stations | About 13 stations forming/ 13 stations |
| Roller Material | Gcr15 Steel with quenching |
| Shaft Material | 45# Steel Diameter 75mm shaft
|
| Maim Motor Power | 7.5 kw |
| Hydraulic cutting Power | 4 kw |
Cutting system | Material Of Cutting | CR12 with quench treatment |
| Hardness | HRC58-62 |
| Tolerance | +-1.5mm |
| Cutting blade | 1 set of cutting blade |
Electrical control system | Electric Source | 220V, 60HZ,3 phase
|
| Control System | PLC with touch screen Japanese Panasonic and Yaskawa Brand |
| Weight | About 3 tons |
| Way Of Drive | 1 inch single chain |
| Size of machine | Length 5500mm* Width 800mm* Height 1500m |
Machine Components
3 ton passive de-coiler | 1 set |
Main roll forming machine | 1 set |
PLC Control box | 1 unit |
Hydraulic station | 1 unit |
Cutting device | 1 unit |
Out table | 2 units |
Flow Chart
Decoiler—feedingwithguide—Rollforming——Cutting—Products collecting
Profile Drawing
Machine Photo
Installation of the machine
The installation comprises of:
- Installation by Sussman service technicians.
- The following services are included:
- Installation of the machine components.
- Adjustment of the machine components.
- Connection of all motors to the control cabinet.
- Installation of the required safety devices.
Delivery extent does not comprise of:
- Media supply (electrics, compressed air, etc.)to the machine(control cabinet)
- Raw material,process material and fuels
- Raw material for test blocks
- Transport and lifting devices
- Auxiliary staff.
The operators of the plant should be present during the installation in order to become familiar with the new machines.